WTF is up with the Bike Plan? Under 9 km installed 2018

Not quite 9 km of new bike lanes installed in Toronto in 2018 About the same planned for 2019 by Robert Zaichkowski and Albert Koehl  This 750m bi-directional bike lane along Harbour-Lakeshore Blvd W. (between Bay and Rees Streets) was … Continue reading

Posted in Uncategorized | Tagged , , , , , , , , , | 1 Comment

Bike plan implementation in Toronto is too slow

Illustration by Warren Wheeler Tracking Toronto’s Bike Plan Implementation (be prepared to be disappointed) Only six percent of new bike plan implemented by end of year two by Albert Koehl and Robert Zaichkowski As 2018 begins, the cycling community can celebrate … Continue reading

Posted in Uncategorized | Tagged , , | Leave a comment

Toronto Bike Plan Implementation Tracking as of January 2018

Bike Plan Tracking 2016-2025 (lanescycle trackscontra flowblvd trail.xlsx – Feuil1 For Context Read: Tracking Bike Plan Implementation in Toronto For Context Read: Meet the New Plan, Same as the Old Plan?   

Related Posts Plugin for WordPress, Blogger...
Posted in Uncategorized | Tagged , , , | Leave a comment